Ready-mix concrete is concrete produced at a batching plant and delivered fresh to a construction site. The supplier proportions the ingredients to meet an agreed specification, and a mixer truck normally transports the material. It is commonly used for foundations, slabs, columns and larger construction pours.
How ready-mix concrete is produced
A batching plant measures cementitious materials, aggregates, water and any specified admixtures. The mix is prepared using controlled proportions, with adjustments for material properties and moisture where necessary. Depending on the plant and delivery system, mixing may take place at the plant or in the truck. The concrete must arrive in a condition suitable for placement.
What should you specify when ordering?
Do not order solely by asking for a strong mix. Provide the supplier with the engineer’s required strength class, exposure requirements, consistency, maximum aggregate size and placement method. A pumped mix may need different properties from concrete discharged directly from a truck. Confirm delivery timing, testing arrangements and any restrictions on access.
Ready-mix versus site-mixed concrete
Ready-mix can reduce on-site batching labour and improve consistency when production is properly controlled. It is particularly useful for continuous pours where interruptions would be difficult to manage. Site mixing may be practical for small non-structural jobs, but still requires accurate measurement and suitable materials. Compare the full cost, including delivery, minimum order quantities, labour and equipment.
How much concrete should you order?
Calculate the volume from the actual dimensions. For example, a 5 m by 4 m slab at a specified thickness of 150 mm has a theoretical volume of 3 cubic metres. Add an appropriate allowance for site tolerances and losses after checking the formwork. The example is a quantity calculation, not a recommendation for slab thickness.
Use the concrete calculator to estimate volume, then confirm the order with the contractor and supplier.
Preparing for delivery
Check truck access, ground bearing conditions, overhead obstructions and the discharge location. Complete formwork and reinforcement inspections before the truck arrives. Arrange sufficient labour, equipment, testing and curing materials. Avoid adding water without approval from the responsible supplier or technical representative. Follow the agreed curing plan after finishing.
For production and placement guidance, consult the AfriSam technical reference guide and the project specification. Find suppliers through our construction supplier directory.
Frequently asked questions
The acceptable time depends on the mix, temperature, transport and specification. Agree delivery and discharge limits with the supplier before the pour.
No. Compare the total delivered and placed cost. Small orders may attract delivery or minimum-load charges.
Yes, when the mix is suitable for pumping and the equipment and site arrangements are appropriate. Tell the supplier in advance.
Related construction questions
- What is the difference between cement and concrete?
- What is aggregate in concrete?
- What is reinforcing steel used for?
Have More Construction Questions?
Explore our South African construction knowledge hub for practical answers about building materials, costs, regulations, construction methods and more.
Browse All Construction Questions