Brick walls need movement joints to accommodate changes in dimensions caused by temperature, moisture and other movements without creating excessive restraint stresses. A properly designed joint allows adjacent masonry sections to move relative to one another. It can reduce the risk of uncontrolled cracking, but cannot compensate for inadequate foundations or structural design.
Why masonry moves
All masonry changes dimension as its temperature changes. Fired clay bricks can also undergo long-term moisture expansion, whereas concrete masonry commonly experiences drying shrinkage. Mortar, supporting concrete frames and other connected materials may move differently. When a long wall is restrained, these differences can create tensile stresses that masonry cannot accommodate without cracking.
Where movement joints are needed
The designer considers wall length, height, material properties, openings, corners, changes in thickness and connections to other structures. Long uninterrupted elevations and junctions between different materials deserve particular attention. Joint spacing is not a universal distance: use the applicable design guidance and the brick manufacturer’s recommendations for the specific wall. Structural restraint and stability must remain adequate across the joint.
How a movement joint works
A designed joint separates masonry sections and may contain a compressible filler, backing material and compatible flexible sealant. The details must permit the intended movement while maintaining required weather resistance, fire performance and structural connections. Filling the gap with rigid mortar or bridging it with an inflexible finish can defeat its purpose. Wall ties and other connections near the joint must follow the design.
Practical example: a long boundary wall
Suppose a contractor builds a long exposed brick boundary wall with several changes in direction. The designer identifies suitable movement joint locations and provides details for the wall’s supports and restraint. Before plastering or pointing, the contractor checks that the joints remain clear and that the finish does not bridge them. If cracks later appear near a corner, investigate settlement, restraint and loading rather than assuming a missing joint is the sole cause.
Consult the Clay Brick Association for masonry technical guidance and the Concrete Manufacturers Association for concrete masonry resources. Use the brick calculator for quantity planning, not joint design.
Frequently asked questions
No. A rigid filling can prevent intended movement. Use the specified joint materials.
No. A movement joint is deliberately designed and detailed; a crack is an unintended separation.
Not necessarily. Settlement-related cracking requires assessment of the underlying cause and structural implications.