A house building quote may exclude professional fees, municipal approvals, utility connections, external works, specialist fittings and abnormal ground conditions. The exact exclusions depend on the contract. A quotation for the main building is not necessarily the complete cost of developing a property, so check every exclusion before committing your budget.
Professional fees and approvals
Architectural design, structural engineering, quantity surveying, land surveying and other specialist services may be appointed and paid directly by the owner. Municipal plan submission fees and other approvals can also sit outside the building contract. Confirm who arranges and pays for each service. For regulated home building, check applicable registration and enrolment requirements with the NHBRC.
Site preparation and service connections
Some quotations assume a level, accessible site with ordinary ground conditions. Rock excavation, unsuitable soil removal, retaining structures and groundwater management may require additional work. Check responsibility for temporary water and electricity, permanent connections, municipal charges and any upgrades required to existing infrastructure.
Finishes and external works
Read the specification for kitchen cabinetry, appliances, wardrobes, sanitary fittings, lighting and floor finishes. An allowance may cover only supply rather than installation. Driveways, boundary walls, gates, landscaping and swimming pools are often separately priced. Do not assume that a house described as complete includes every item shown on a concept drawing.
Worked example: the total project budget
| Illustrative budget item | Amount |
|---|---|
| Main building contract | R1,400,000 |
| Professional fees and approvals | R110,000 |
| Service connections | R45,000 |
| External works | R85,000 |
| Contingency | R120,000 |
| Total excluding land and finance | R1,760,000 |
The figures are hypothetical and assumed to include applicable VAT. The wider budget is R360,000 above the main contract. Actual costs depend on the property, municipality, specification and professional appointments.
How to check a quotation before signing
Request a written inclusions and exclusions schedule. Match it against the current drawings, specifications and desired finishes. Obtain prices for missing items and identify who is responsible for procurement, installation and approvals. Check the treatment of VAT, price adjustments, provisional sums and variations. Include financing and land costs separately if they form part of your investment decision.
The ASAQS quantity surveying resources explain professional cost management. Use our house building cost calculator to test the overall budget before seeking project-specific advice.
Frequently asked questions
Not automatically. Check the contract and confirm the relevant municipality’s requirements and charges.
It depends on the specification. They may be fully priced, allowed for provisionally or excluded.
Allow for project risks in your overall budget, but avoid double counting reserves already included in the contract.
Related construction questions
- How Do You Calculate Building Cost per Square Metre?
- What is a construction contingency allowance?
- What is a prime cost allowance?
Have More Construction Questions?
Explore our South African construction knowledge hub for practical answers about building materials, costs, regulations, construction methods and more.
Browse All Construction Questions